ADS8320EVM-PDK this integrated circuit is available in factory sealed anti static packs. at icwhale.com. Please read product page below detail information. including ADS8320EVM-PDK price, data-sheet, in-stock availability, technical difficulties. Also. Quickly Enter the access of compare listing to find out replaceable electronic parts. If you want to retrieve comprehensive data for ADS8320EVM-PDK to optimize the supply chain (including cross references, life-cycle, parametric, counterfeit risk, obsolescence managements forecasts), please contact to our Tech-supports team.
There is no doubt that you may place an order without registering to icwhale.com.
We strongly suggest you sign in our shop before purchasing as you can track your order real-time tracking.
For your convenience, we support multiple payment methods in USD, including PayPal, Credit Card, wire transfer. and Alipay.
It is recommended to acquire for quotations to get the latest prices and inventories about the parts.
Our sales will reply to your request by email within 24 hours.
1. You'll receive an order information email in your email inbox. (Please remember to check the spam folder if you didn't hear from us).
2. Since inventories and prices may fluctuate to some extent, the sales manager is going to reconfirm the order and let you know if there are any updates.
Shipping fee starts at $35, but some countries will exceed $35. For example (South Africa, Brazil, India, Pakistan, Israel, etc.)
The basic freight (for package ≤0.5kg or corresponding volume) depends on the time zone and countries.
Currently, our products are shipped through DHL, FedEx, SF, UPS and China Post.
Once your order has been shipped, the tracking number will be sent to the email address registered to your account. This information can also be viewed when logged into your account in the "my account" page.
Views:
Key Features of the ADS8320EVM-PDK:
1. 16-Bit ADC: The ADS8320 offers high-precision 16-bit data conversion.
2. High-Speed Operation: Suitable for applications that require fast sampling rates.
3. Low Power Consumption: Ideal for power-sensitive applications due to efficient power usage.
4. Serial Interface: Equipped with a Serial Peripheral Interface (SPI), facilitating easy integration with microcontrollers and digital systems.
Application Scenario: Precision Data Acquisition System
Circuit Connection Details for ADS8320 on the ADS8320EVM-PDK:
1. Power Supply Connection: Connect the VDD pin of the ADS8320 on the EVM to a stable power source, typically 5V or 3.3V.
2. Analog Input: Attach the analog signal source (such as a sensor output) to the IN+ and IN- pins of the ADS8320 for analog-to-digital conversion.
3. Digital Interface Setup: Interface the SCLK (Serial Clock), SDI (Serial Data In), and SDO (Serial Data Out) pins with a compatible microcontroller or digital processor for SPI communication.
4. Reference Voltage: Apply a stable reference voltage to the VREF pin for accurate ADC operation. This voltage should be consistent with the desired input range.
Design Considerations:
1. Stable Power Source: Ensure a clean and stable power supply is provided for accurate ADC functioning.
2. Signal Integrity: Implement noise reduction and filtering techniques to maintain the integrity of the analog input signal.
3. SPI Communication Reliability: Establish a robust SPI communication, considering factors such as signal integrity, speed, and compatibility with the microcontroller.
4. Thermal Management: Manage thermal considerations, especially in designs where the ADC may be subject to high sampling rates over extended periods.
Conclusion
The ADS8320EVM-PDK is a comprehensive solution for developing and testing applications that utilize the ADS8320 ADC, particularly in precision data acquisition systems. Utilizing the ADS8320EVM-PDK requires attention to power supply quality, signal integrity, reliable SPI communication, and thermal management to ensure the optimal performance of the ADC in the intended application environment.
Currently, icwhale.com only provide peer-to-peer order processing. While you submit the RFQ, our professional agent will contact you with the competitive prices in the global market, and our agent will prompt you to finish the order if you accept our offers.
We have a professional and experienced quality control team to strictly verify and test the ADS8320EVM-PDK. All suppliers must pass our qualification reviews before they can publish their products including ADS8320EVM-PDK on icwhale.com; we pay more attention to the channels and quality of ADS8320EVM-PDK products than any other customer. We strictly implement supplier audits, so you can purchase with confidence.
The price and inventory of ADS8320EVM-PDK fluctuates frequently and cannot be updated in time, it will be updated periodically within 24 hours. And, our quotation usually expires after 5 days.
Wire Transfer, PayPal, Alipay, Wechat, Credit Card, Western Union, MoneyGram, and Escrow are all acceptable.
Warm Tips: Some orders in certain payment forms may require handling fee.
Customers can choose industry-leading freight companies, including DHL, UPS, FedEx, TNT, and Registered Mail. Shipping insurance is also available.
Once your order has been processed for shipment, our salesperson will send you an email advising you of the shipping status and tracking number.
Warm Tips: It may take up to 24 hours for the carriers to display tracking information. Usually, express delivery takes 3-5 days, and registered mail takes 25-60 days.
All goods will implement Pre-Shipment Inspection (PSI), selected at random from all batches of your order to do a systematic inspection before arranging the shipment. If there is something wrong with the ADS8320EVM-PDK we delivered, we will accept the replacement or return of the ADS8320EVM-PDK only when all of the below conditions are fulfilled:
(1)Such as a deficiency in quantity, delivery of wrong items, and apparent external defects (breakage and rust, etc.), and we acknowledge such problems.
(2)We are informed of the defect described above within 90 days after the delivery of ADS8320EVM-PDK.
(3)The PartNo is unused and only in the original unpacked packaging.
Two processes to return the products:
(1)Inform us within 90 days
(2)Obtain Requesting Return Authorizations
If you need any after-sales service, please do not hesitate to contact us.
Phone