ADS1248V2EVM-PDK this integrated circuit is available in factory sealed anti static packs. at icwhale.com. Please read product page below detail information. including ADS1248V2EVM-PDK price, data-sheet, in-stock availability, technical difficulties. Also. Quickly Enter the access of compare listing to find out replaceable electronic parts. If you want to retrieve comprehensive data for ADS1248V2EVM-PDK to optimize the supply chain (including cross references, life-cycle, parametric, counterfeit risk, obsolescence managements forecasts), please contact to our Tech-supports team.
There is no doubt that you may place an order without registering to icwhale.com.
We strongly suggest you sign in our shop before purchasing as you can track your order real-time tracking.
For your convenience, we support multiple payment methods in USD, including PayPal, Credit Card, wire transfer. and Alipay.
It is recommended to acquire for quotations to get the latest prices and inventories about the parts.
Our sales will reply to your request by email within 24 hours.
1. You'll receive an order information email in your email inbox. (Please remember to check the spam folder if you didn't hear from us).
2. Since inventories and prices may fluctuate to some extent, the sales manager is going to reconfirm the order and let you know if there are any updates.
Shipping fee starts at $35, but some countries will exceed $35. For example (South Africa, Brazil, India, Pakistan, Israel, etc.)
The basic freight (for package ≤0.5kg or corresponding volume) depends on the time zone and countries.
Currently, our products are shipped through DHL, FedEx, SF, UPS and China Post.
Once your order has been shipped, the tracking number will be sent to the email address registered to your account. This information can also be viewed when logged into your account in the "my account" page.
Views:
Key Features of the ADS1248V2EVM-PDK:
1. High Resolution: The ADS1248 offers 24-bit resolution, enabling precise data conversion.
2. Multiple Channels: It supports up to 8 differential or 15 single-ended inputs, ideal for various sensor types.
3. Integrated PGA: Includes a programmable gain amplifier for enhancing small signal measurements.
4. Low Power Consumption: Efficient for battery-operated and portable applications.
Application Scenario: Multichannel Data Acquisition System
Circuit Connection Details for ADS1248 on the ADS1248V2EVM-PDK:
1. Power Supply Configuration: Connect the AVDD and DVDD pins to a stable power source within the 2.7V to 5.5V range.
2. Sensor Integration: Attach sensors (like thermocouples) to the AIN0 to AIN7 pins for multichannel measurement.
3. SPI Communication Setup: Interface the SPI pins (CS, SCLK, DIN, DOUT) of the ADS1248 with the corresponding SPI pins on a microcontroller.
4. Reference Voltage Application: Apply a precision reference voltage to the REFP and REFN pins for accurate ADC operation.
Design Considerations:
1. Stable Power Source: A clean and stable power supply is critical for maintaining the accuracy of the ADC.
2. Sensor Selection and Wiring: Choose appropriate sensors for your application and ensure proper wiring to minimize error.
3. SPI Communication Protocol: Establish a strong SPI communication protocol to ensure dependable data transmission.
4. Environmental Factors: Consider environmental factors like temperature fluctuations and electromagnetic interference that could affect sensor readings.
Conclusion
The ADS1248V2EVM-PDK is an essential tool for developing applications using the ADS1248 ADC. It is particularly effective in high-precision measurement applications such as multichannel data acquisition systems. When designing circuits with the ADS1248 on the ADS1248V2EVM-PDK, it is important to consider factors like power supply stability, sensor choice and wiring, communication integrity, and environmental influences to ensure accurate and reliable measurements.
Currently, icwhale.com only provide peer-to-peer order processing. While you submit the RFQ, our professional agent will contact you with the competitive prices in the global market, and our agent will prompt you to finish the order if you accept our offers.
We have a professional and experienced quality control team to strictly verify and test the ADS1248V2EVM-PDK. All suppliers must pass our qualification reviews before they can publish their products including ADS1248V2EVM-PDK on icwhale.com; we pay more attention to the channels and quality of ADS1248V2EVM-PDK products than any other customer. We strictly implement supplier audits, so you can purchase with confidence.
The price and inventory of ADS1248V2EVM-PDK fluctuates frequently and cannot be updated in time, it will be updated periodically within 24 hours. And, our quotation usually expires after 5 days.
Wire Transfer, PayPal, Alipay, Wechat, Credit Card, Western Union, MoneyGram, and Escrow are all acceptable.
Warm Tips: Some orders in certain payment forms may require handling fee.
Customers can choose industry-leading freight companies, including DHL, UPS, FedEx, TNT, and Registered Mail. Shipping insurance is also available.
Once your order has been processed for shipment, our salesperson will send you an email advising you of the shipping status and tracking number.
Warm Tips: It may take up to 24 hours for the carriers to display tracking information. Usually, express delivery takes 3-5 days, and registered mail takes 25-60 days.
All goods will implement Pre-Shipment Inspection (PSI), selected at random from all batches of your order to do a systematic inspection before arranging the shipment. If there is something wrong with the ADS1248V2EVM-PDK we delivered, we will accept the replacement or return of the ADS1248V2EVM-PDK only when all of the below conditions are fulfilled:
(1)Such as a deficiency in quantity, delivery of wrong items, and apparent external defects (breakage and rust, etc.), and we acknowledge such problems.
(2)We are informed of the defect described above within 90 days after the delivery of ADS1248V2EVM-PDK.
(3)The PartNo is unused and only in the original unpacked packaging.
Two processes to return the products:
(1)Inform us within 90 days
(2)Obtain Requesting Return Authorizations
If you need any after-sales service, please do not hesitate to contact us.
Phone