ADS1248EVM-PDK

lmages are for reference only See Product Specifications

FREE SAMPLE

Texas Instruments ADS1248EVM-PDK

HIGH-RELIABILITY-COMPONENTS
Part No.:
ADS1248EVM-PDK
Manufacturer:
Texas Instruments
Package:
Datasheet:
ADS1248EVM-PDK.pdf
Description:
KIT DEMO FOR ADS1248
In Stock:
3015
Quantity:
  Add To Cart
For more detailed including pricing and shipping
Quick response, quick quotation
Flash shipment, no worries after sales
Original channel, guarantee of the authentic products

Please send RFQ , we will respond immediately.

Part Number
Quantity
Email / phone number*
Contact Name / Company Name
Comments
  • Purchase and inquiryPurchase and inquiry

    ADS1248EVM-PDK this integrated circuit is available in factory sealed anti static packs. at icwhale.com. Please read product page below detail information. including ADS1248EVM-PDK price, data-sheet, in-stock availability, technical difficulties. Also. Quickly Enter the access of compare listing to find out replaceable electronic parts. If you want to retrieve comprehensive data for ADS1248EVM-PDK to optimize the supply chain (including cross references, life-cycle, parametric, counterfeit risk, obsolescence managements forecasts), please contact to our Tech-supports team.

    Purchase in icwhale.com

    There is no doubt that you may place an order without registering to icwhale.com.

    We strongly suggest you sign in our shop before purchasing as you can track your order real-time tracking.

    Means of Payment in icwhale.com

    For your convenience, we support multiple payment methods in USD, including PayPal, Credit Card, wire transfer. and Alipay.

    RFQ (Request for Quotations) in icwhale.com

    It is recommended to acquire for quotations to get the latest prices and inventories about the parts.

    Our sales will reply to your request by email within 24 hours.

    Warm reminder

    1. You'll receive an order information email in your email inbox. (Please remember to check the spam folder if you didn't hear from us).

    2. Since inventories and prices may fluctuate to some extent, the sales manager is going to reconfirm the order and let you know if there are any updates.

    Shipping & Handling

    Shipping fee starts at $35, but some countries will exceed $35. For example (South Africa, Brazil, India, Pakistan, Israel, etc.)

    The basic freight (for package ≤0.5kg or corresponding volume) depends on the time zone and countries.

    Shipping Method

    Currently, our products are shipped through DHL, FedEx, SF, UPS and China Post.

    Order Tracking for International Orders

    Once your order has been shipped, the tracking number will be sent to the email address registered to your account. This information can also be viewed when logged into your account in the "my account" page.

    ADS1248EVM-PDK informationADS1248EVM-PDK information

    Views:

    ADS1248EVM-PDK Typical application Circuitry

    ADS1248EVM-PDK

    The ADS1248EVM-PDK is a Performance Development Kit (PDK) for the ADS1248, which is a 24-bit, highly integrated, multichannel analog-to-digital converter (ADC) from Texas Instruments. The PDK includes an evaluation module (EVM) that facilitates the testing and development of applications using the ADS1248 chip. This kit is used in various high-precision measurement applications, including industrial process control, temperature sensing with RTDs or thermocouples, and pressure sensing.

    1. High-Resolution ADC: The ADS1248 features a 24-bit resolution for precise data conversion.

    2. Multiple Channels: Up to 8 differential or 15 single-ended inputs can be supported by it.

    3. Integrated PGA: Includes a programmable gain amplifier for small signal amplification.

    4. Low Power Consumption:Because of its effective power utilization, battery-operated systems can use it.

    Application Scenario: Multichannel Temperature Monitoring

    Circuit Connection Details for ADS1248 on the ADS1248EVM-PDK:

    1. Power Supply: Ensure the ADS1248 on the EVM is connected to a stable power source. AVDD and DVDD should be between 2.7V and 5.5V.

    2. Temperature Sensor Integration: Connect RTD sensors to the AIN0 to AIN7 pins for multichannel temperature monitoring.

    3. Data Communication: Utilize the SPI interface of the ADS1248 for communication with a microcontroller by connecting the CS, SCLK, DIN, and DOUT pins.

    4. Reference Voltage: Apply a precision reference voltage to the REFP and REFN pins to ensure accurate ADC conversions.

    Design Considerations of ADS1248EVM-PDK:

    1. Stable Power Supply: A clean and stable power source is essential for maintaining the precision of the ADC.

    2. Sensor Selection and Wiring: Choose appropriate RTDs for your application and ensure proper wiring to minimize error.

    3. SPI Communication Integrity: Implement a robust communication protocol to ensure error-free data transfer.

    4. Environmental Factors: Be aware of environmental factors like temperature and electromagnetic interference that could affect sensor readings.

    Conclusion

    The ADS1248EVM-PDK is an essential tool for developing and testing applications using the ADS1248 ADC. Its high-resolution ADC, multiple channels, integrated PGA, and low power consumption make it suitable for a wide range of precision measurement applications. When designing a circuit with the ADS1248 on the ADS1248EVM-PDK, considerations like power supply stability, sensor selection, communication integrity, and environmental factors are crucial for achieving accurate and reliable measurements in applications such as multichannel temperature monitoring.

    ADS1248EVM-PDK FAQ

    1. How to order ADS1248EVM-PDK on icwhale.com?

    Currently, icwhale.com only provide peer-to-peer order processing. While you submit the RFQ, our professional agent will contact you with the competitive prices in the global market, and our agent will prompt you to finish the order if you accept our offers.

    2. How does icwhale.com guarantee that ADS1248EVM-PDK is from the original manufacturer or authorized agents?

    We have a professional and experienced quality control team to strictly verify and test the ADS1248EVM-PDK. All suppliers must pass our qualification reviews before they can publish their products including ADS1248EVM-PDK on icwhale.com; we pay more attention to the channels and quality of ADS1248EVM-PDK products than any other customer. We strictly implement supplier audits, so you can purchase with confidence.

    3. Are the ADS1248EVM-PDK price and inventory displayed accurate?

    The price and inventory of ADS1248EVM-PDK fluctuates frequently and cannot be updated in time, it will be updated periodically within 24 hours. And, our quotation usually expires after 5 days.

    4. What forms of payment are accepted?

    Wire Transfer, PayPal, Alipay, Wechat, Credit Card, Western Union, MoneyGram, and Escrow are all acceptable.

    Warm Tips: Some orders in certain payment forms may require handling fee.

    5. How is the shipping arranged?

    Customers can choose industry-leading freight companies, including DHL, UPS, FedEx, TNT, and Registered Mail. Shipping insurance is also available.

    Once your order has been processed for shipment, our salesperson will send you an email advising you of the shipping status and tracking number.

    Warm Tips: It may take up to 24 hours for the carriers to display tracking information. Usually, express delivery takes 3-5 days, and registered mail takes 25-60 days.

    6. What is the process for return or replacement of ADS1248EVM-PDK?

    All goods will implement Pre-Shipment Inspection (PSI), selected at random from all batches of your order to do a systematic inspection before arranging the shipment. If there is something wrong with the ADS1248EVM-PDK we delivered, we will accept the replacement or return of the ADS1248EVM-PDK only when all of the below conditions are fulfilled:

    (1)Such as a deficiency in quantity, delivery of wrong items, and apparent external defects (breakage and rust, etc.), and we acknowledge such problems.

    (2)We are informed of the defect described above within 90 days after the delivery of ADS1248EVM-PDK.

    (3)The PartNo is unused and only in the original unpacked packaging.

    Two processes to return the products:

    (1)Inform us within 90 days

    (2)Obtain Requesting Return Authorizations

    7.How to contact us to get technical supports, such as ADS1248EVM-PDK pin diagram, ADS1248EVM-PDK datasheet?

    If you need any after-sales service, please do not hesitate to contact us.

    Hot Products

    Home

    Home

    Products

    Products

    Phone

    Phone

    Contact Us

    Contact