ADS1248EVM

lmages are for reference only See Product Specifications

FREE SAMPLE

Texas Instruments ADS1248EVM

HIGH-RELIABILITY-COMPONENTS
Part No.:
ADS1248EVM
Manufacturer:
Texas Instruments
Package:
Datasheet:
ADS1248EVM.pdf
Description:
EVAL MODULE FOR ADS1248
In Stock:
3529
Quantity:
  Add To Cart
For more detailed including pricing and shipping
Quick response, quick quotation
Flash shipment, no worries after sales
Original channel, guarantee of the authentic products

Please send RFQ , we will respond immediately.

Part Number
Quantity
Email / phone number*
Contact Name / Company Name
Comments
  • Purchase and inquiryPurchase and inquiry

    ADS1248EVM this integrated circuit is available in factory sealed anti static packs. at icwhale.com. Please read product page below detail information. including ADS1248EVM price, data-sheet, in-stock availability, technical difficulties. Also. Quickly Enter the access of compare listing to find out replaceable electronic parts. If you want to retrieve comprehensive data for ADS1248EVM to optimize the supply chain (including cross references, life-cycle, parametric, counterfeit risk, obsolescence managements forecasts), please contact to our Tech-supports team.

    Purchase in icwhale.com

    There is no doubt that you may place an order without registering to icwhale.com.

    We strongly suggest you sign in our shop before purchasing as you can track your order real-time tracking.

    Means of Payment in icwhale.com

    For your convenience, we support multiple payment methods in USD, including PayPal, Credit Card, wire transfer. and Alipay.

    RFQ (Request for Quotations) in icwhale.com

    It is recommended to acquire for quotations to get the latest prices and inventories about the parts.

    Our sales will reply to your request by email within 24 hours.

    Warm reminder

    1. You'll receive an order information email in your email inbox. (Please remember to check the spam folder if you didn't hear from us).

    2. Since inventories and prices may fluctuate to some extent, the sales manager is going to reconfirm the order and let you know if there are any updates.

    Shipping & Handling

    Shipping fee starts at $35, but some countries will exceed $35. For example (South Africa, Brazil, India, Pakistan, Israel, etc.)

    The basic freight (for package ≤0.5kg or corresponding volume) depends on the time zone and countries.

    Shipping Method

    Currently, our products are shipped through DHL, FedEx, SF, UPS and China Post.

    Order Tracking for International Orders

    Once your order has been shipped, the tracking number will be sent to the email address registered to your account. This information can also be viewed when logged into your account in the "my account" page.

    ADS1248EVM informationADS1248EVM information

    Views:

    ADS1248EVM Typical application Circuitry

    ADS1248EVM

    The ADS1248EVM is an Evaluation Module (EVM) for the ADS1248, a 24-bit, multi-channel analog-to-digital converter (ADC) designed by Texas Instruments. This EVM is utilized to facilitate the development and testing of systems that require precise analog-to-digital conversion, such as in industrial process control, temperature sensing with RTDs or thermocouples, and other precision measurement applications.

    Key Features of the ADS1248:

    1. High-Resolution ADC: The ADS1248, which is the focus of the ADS1248EVM, offers a 24-bit resolution.

    2. Multiple Input Channels: It supports up to 8 differential or 15 single-ended inputs, making it versatile for various sensor types.

    3. Integrated PGA: The ADS1248 includes a programmable gain amplifier, beneficial for amplifying small signals.

    4. Low Power Consumption: Its efficiency makes it ideal for battery-operated and portable applications.

    Application Scenario: Temperature Sensing with Thermocouples

    Circuit Connection Details for ADS1248 on the ADS1248EVM:

    1. Power Supply Configuration: Connect the AVDD and DVDD pins to a stable power source, within the range of 2.7V to 5.5V.

    2. Thermocouple Connection: Attach thermocouples to the AIN0 to AIN7 pins for temperature measurement across multiple channels.

    3. SPI Interface Setup: Configure the SPI pins (CS, SCLK, DIN, DOUT) for communication with a microcontroller.

    4. Reference Voltage Application: Use a precision reference voltage connected to the REFP and REFN pins for accurate ADC operation.

    Design Considerations:

    1. Stable Power Supply: It's crucial to provide a clean and stable power source to ensure accuracy in ADC conversions.

    2. Sensor Type and Wiring: Select appropriate thermocouples and ensure proper wiring to minimize errors.

    3. Reliable SPI Communication: Implement robust SPI communication to ensure accurate and error-free data transfer.

    4. Environmental Considerations: Account for environmental factors like electromagnetic interference and temperature fluctuations which might affect the readings.

    Conclusion

    The ADS1248EVM is a vital tool for developing applications that utilize the ADS1248 ADC. It is particularly suited for high-precision measurement applications. When using the ADS1248EVM, it is important to consider factors such as power supply stability, sensor selection and wiring, communication protocol, and environmental influences to ensure the accuracy and reliability of the measurements, especially in scenarios like temperature sensing with thermocouples.

    ADS1248EVM FAQ

    1. How to order ADS1248EVM on icwhale.com?

    Currently, icwhale.com only provide peer-to-peer order processing. While you submit the RFQ, our professional agent will contact you with the competitive prices in the global market, and our agent will prompt you to finish the order if you accept our offers.

    2. How does icwhale.com guarantee that ADS1248EVM is from the original manufacturer or authorized agents?

    We have a professional and experienced quality control team to strictly verify and test the ADS1248EVM. All suppliers must pass our qualification reviews before they can publish their products including ADS1248EVM on icwhale.com; we pay more attention to the channels and quality of ADS1248EVM products than any other customer. We strictly implement supplier audits, so you can purchase with confidence.

    3. Are the ADS1248EVM price and inventory displayed accurate?

    The price and inventory of ADS1248EVM fluctuates frequently and cannot be updated in time, it will be updated periodically within 24 hours. And, our quotation usually expires after 5 days.

    4. What forms of payment are accepted?

    Wire Transfer, PayPal, Alipay, Wechat, Credit Card, Western Union, MoneyGram, and Escrow are all acceptable.

    Warm Tips: Some orders in certain payment forms may require handling fee.

    5. How is the shipping arranged?

    Customers can choose industry-leading freight companies, including DHL, UPS, FedEx, TNT, and Registered Mail. Shipping insurance is also available.

    Once your order has been processed for shipment, our salesperson will send you an email advising you of the shipping status and tracking number.

    Warm Tips: It may take up to 24 hours for the carriers to display tracking information. Usually, express delivery takes 3-5 days, and registered mail takes 25-60 days.

    6. What is the process for return or replacement of ADS1248EVM?

    All goods will implement Pre-Shipment Inspection (PSI), selected at random from all batches of your order to do a systematic inspection before arranging the shipment. If there is something wrong with the ADS1248EVM we delivered, we will accept the replacement or return of the ADS1248EVM only when all of the below conditions are fulfilled:

    (1)Such as a deficiency in quantity, delivery of wrong items, and apparent external defects (breakage and rust, etc.), and we acknowledge such problems.

    (2)We are informed of the defect described above within 90 days after the delivery of ADS1248EVM.

    (3)The PartNo is unused and only in the original unpacked packaging.

    Two processes to return the products:

    (1)Inform us within 90 days

    (2)Obtain Requesting Return Authorizations

    7.How to contact us to get technical supports, such as ADS1248EVM pin diagram, ADS1248EVM datasheet?

    If you need any after-sales service, please do not hesitate to contact us.

    Hot Products

    Home

    Home

    Products

    Products

    Phone

    Phone

    Contact Us

    Contact