TPS51200EVM

lmages are for reference only See Product Specifications

FREE SAMPLE

Texas Instruments TPS51200EVM

HIGH-RELIABILITY-COMPONENTS
Part No.:
TPS51200EVM
Manufacturer:
Texas Instruments
Package:
Datasheet:
TPS51200EVM.pdf
Description:
EVALUATION MODULE FOR TPS51200
In Stock:
2839
Quantity:
  Add To Cart
For more detailed including pricing and shipping
Quick response, quick quotation
Flash shipment, no worries after sales
Original channel, guarantee of the authentic products

Please send RFQ , we will respond immediately.

Part Number
Quantity
Email / phone number*
Contact Name / Company Name
Comments
  • Purchase and inquiryPurchase and inquiry

    TPS51200EVM this integrated circuit is available in factory sealed anti static packs. at icwhale.com. Please read product page below detail information. including TPS51200EVM price, data-sheet, in-stock availability, technical difficulties. Also. Quickly Enter the access of compare listing to find out replaceable electronic parts. If you want to retrieve comprehensive data for TPS51200EVM to optimize the supply chain (including cross references, life-cycle, parametric, counterfeit risk, obsolescence managements forecasts), please contact to our Tech-supports team.

    Purchase in icwhale.com

    There is no doubt that you may place an order without registering to icwhale.com.

    We strongly suggest you sign in our shop before purchasing as you can track your order real-time tracking.

    Means of Payment in icwhale.com

    For your convenience, we support multiple payment methods in USD, including PayPal, Credit Card, wire transfer. and Alipay.

    RFQ (Request for Quotations) in icwhale.com

    It is recommended to acquire for quotations to get the latest prices and inventories about the parts.

    Our sales will reply to your request by email within 24 hours.

    Warm reminder

    1. You'll receive an order information email in your email inbox. (Please remember to check the spam folder if you didn't hear from us).

    2. Since inventories and prices may fluctuate to some extent, the sales manager is going to reconfirm the order and let you know if there are any updates.

    Shipping & Handling

    Shipping fee starts at $35, but some countries will exceed $35. For example (South Africa, Brazil, India, Pakistan, Israel, etc.)

    The basic freight (for package ≤0.5kg or corresponding volume) depends on the time zone and countries.

    Shipping Method

    Currently, our products are shipped through DHL, FedEx, SF, UPS and China Post.

    Order Tracking for International Orders

    Once your order has been shipped, the tracking number will be sent to the email address registered to your account. This information can also be viewed when logged into your account in the "my account" page.

    TPS51200EVM informationTPS51200EVM information

    Views:

    TPS51200EVM Typical application Circuitry

    TPS51200EVM

    The TPS51200EVM is an evaluation module designed for assessing the performance and functionality of the TPS51200 integrated circuit. The TPS51200 is a voltage-mode synchronous buck controller engineered to regulate the output voltage of a DC-DC converter with high efficiency. It finds applications in scenarios where precise voltage regulation and power efficiency are paramount.

    Key Parameters and Features of TPS51200EVM:

    1. Voltage Regulation: The TPS51200EVM is tailored for accurate voltage regulation, ensuring a stable and controlled output voltage.

    2. Efficiency: It delivers high power conversion efficiency, effectively minimizing power losses and enhancing overall energy efficiency.

    3. Input Voltage Range: The TPS51200EVM operates within a specified input voltage range, rendering it adaptable to a wide spectrum of power supply configurations.

    4. Output Current Handling: The IC can manage a specific output current, contingent upon the application and circuit setup.

    Application Scenario: Laptop Power Adapter

    In this application scenario, we will design a laptop power adapter circuit employing the TPS51200EVM.

    Circuit Connection:

    - Connect the laptop's power source (typically an AC adapter) to the input power terminals of the TPS51200EVM.

    - Ground the circuit by attaching the ground terminal of the AC adapter to the ground terminal of the TPS51200EVM.

    - Link the output terminals of the TPS51200EVM to the laptop's motherboard, which further distributes power to the various internal components.

    - Configure the TPS51200EVM's output voltage to match the laptop's voltage requirements through the adjustment of resistor values or voltage reference sources.

    Additional Considerations:

    1. Efficiency Optimization: The power supply circuit should be optimized for high efficiency to minimize heat generation and extend laptop battery life.

    2. Overcurrent Protection: Implement overcurrent protection mechanisms to safeguard the laptop's components and the power supply circuit from excessive current flow.

    3. Voltage Ripple Control: Minimize voltage ripple and noise in the power supply output to prevent instability or damage to sensitive laptop components.

    4. Transient Response: Enhance the power supply's transient response to accommodate sudden changes in load conditions without causing voltage fluctuations.

    5. EMI/EMC Compliance: Ensure that the power supply circuit complies with electromagnetic interference (EMI) and electromagnetic compatibility (EMC) standards to prevent interference with other electronic devices.

    6. Heat Dissipation: Implement effective heat dissipation techniques, such as heatsinks or thermal management, to maintain the TPS51200EVM's temperature within safe limits.

    7. Input Voltage Range: Ensure that the laptop power supply can handle a wide range of input voltages, accounting for variations due to the AC adapter.

    8. Output Voltage Accuracy: Maintain precise output voltage regulation to prevent under- or over-voltage conditions in the laptop.

    By addressing these considerations and adhering to the provided circuit connections, you can create a robust, efficient, and reliable laptop power supply circuit utilizing the TPS51200EVM. This circuit will deliver stable and controlled voltage output while effectively managing power, ensuring optimal performance and protection for laptop components.

    TPS51200EVM FAQ

    1. How to order TPS51200EVM on icwhale.com?

    Currently, icwhale.com only provide peer-to-peer order processing. While you submit the RFQ, our professional agent will contact you with the competitive prices in the global market, and our agent will prompt you to finish the order if you accept our offers.

    2. How does icwhale.com guarantee that TPS51200EVM is from the original manufacturer or authorized agents?

    We have a professional and experienced quality control team to strictly verify and test the TPS51200EVM. All suppliers must pass our qualification reviews before they can publish their products including TPS51200EVM on icwhale.com; we pay more attention to the channels and quality of TPS51200EVM products than any other customer. We strictly implement supplier audits, so you can purchase with confidence.

    3. Are the TPS51200EVM price and inventory displayed accurate?

    The price and inventory of TPS51200EVM fluctuates frequently and cannot be updated in time, it will be updated periodically within 24 hours. And, our quotation usually expires after 5 days.

    4. What forms of payment are accepted?

    Wire Transfer, PayPal, Alipay, Wechat, Credit Card, Western Union, MoneyGram, and Escrow are all acceptable.

    Warm Tips: Some orders in certain payment forms may require handling fee.

    5. How is the shipping arranged?

    Customers can choose industry-leading freight companies, including DHL, UPS, FedEx, TNT, and Registered Mail. Shipping insurance is also available.

    Once your order has been processed for shipment, our salesperson will send you an email advising you of the shipping status and tracking number.

    Warm Tips: It may take up to 24 hours for the carriers to display tracking information. Usually, express delivery takes 3-5 days, and registered mail takes 25-60 days.

    6. What is the process for return or replacement of TPS51200EVM?

    All goods will implement Pre-Shipment Inspection (PSI), selected at random from all batches of your order to do a systematic inspection before arranging the shipment. If there is something wrong with the TPS51200EVM we delivered, we will accept the replacement or return of the TPS51200EVM only when all of the below conditions are fulfilled:

    (1)Such as a deficiency in quantity, delivery of wrong items, and apparent external defects (breakage and rust, etc.), and we acknowledge such problems.

    (2)We are informed of the defect described above within 90 days after the delivery of TPS51200EVM.

    (3)The PartNo is unused and only in the original unpacked packaging.

    Two processes to return the products:

    (1)Inform us within 90 days

    (2)Obtain Requesting Return Authorizations

    7.How to contact us to get technical supports, such as TPS51200EVM pin diagram, TPS51200EVM datasheet?

    If you need any after-sales service, please do not hesitate to contact us.

    Hot Products

    Home

    Home

    Products

    Products

    Phone

    Phone

    Contact Us

    Contact