LM3248EVM

lmages are for reference only See Product Specifications

FREE SAMPLE

Texas Instruments LM3248EVM

HIGH-RELIABILITY-COMPONENTS
Part No.:
LM3248EVM
Manufacturer:
Texas Instruments
Package:
Datasheet:
LM3248EVM.pdf
Description:
EVAL MODULE FOR LM3248
In Stock:
2059
Quantity:
  Add To Cart
For more detailed including pricing and shipping
Quick response, quick quotation
Flash shipment, no worries after sales
Original channel, guarantee of the authentic products

Please send RFQ , we will respond immediately.

Part Number
Quantity
Email / phone number*
Contact Name / Company Name
Comments
  • Purchase and inquiryPurchase and inquiry

    LM3248EVM this integrated circuit is available in factory sealed anti static packs. at icwhale.com. Please read product page below detail information. including LM3248EVM price, data-sheet, in-stock availability, technical difficulties. Also. Quickly Enter the access of compare listing to find out replaceable electronic parts. If you want to retrieve comprehensive data for LM3248EVM to optimize the supply chain (including cross references, life-cycle, parametric, counterfeit risk, obsolescence managements forecasts), please contact to our Tech-supports team.

    Purchase in icwhale.com

    There is no doubt that you may place an order without registering to icwhale.com.

    We strongly suggest you sign in our shop before purchasing as you can track your order real-time tracking.

    Means of Payment in icwhale.com

    For your convenience, we support multiple payment methods in USD, including PayPal, Credit Card, wire transfer. and Alipay.

    RFQ (Request for Quotations) in icwhale.com

    It is recommended to acquire for quotations to get the latest prices and inventories about the parts.

    Our sales will reply to your request by email within 24 hours.

    Warm reminder

    1. You'll receive an order information email in your email inbox. (Please remember to check the spam folder if you didn't hear from us).

    2. Since inventories and prices may fluctuate to some extent, the sales manager is going to reconfirm the order and let you know if there are any updates.

    Shipping & Handling

    Shipping fee starts at $35, but some countries will exceed $35. For example (South Africa, Brazil, India, Pakistan, Israel, etc.)

    The basic freight (for package ≤0.5kg or corresponding volume) depends on the time zone and countries.

    Shipping Method

    Currently, our products are shipped through DHL, FedEx, SF, UPS and China Post.

    Order Tracking for International Orders

    Once your order has been shipped, the tracking number will be sent to the email address registered to your account. This information can also be viewed when logged into your account in the "my account" page.

    LM3248EVM informationLM3248EVM information

    Views:

    LM3248EVM Typical application Circuitry

    LM3248EVM

    The LM3248EVM is an Evaluation Module (EVM) designed for the LM3248 series of integrated circuits. These ICs are primarily targeted for power management applications, particularly in compact and portable electronic devices. The LM3248EVM serves as a platform to facilitate the testing and performance evaluation of LM3248 ICs under various circuit conditions, allowing designers to assess the IC's capabilities in a controlled environment.

    1. Power Supply Connectivity: The LM3248EVM requires a voltage supply within a specified range, typically 2.7V to 5.5V, which should be connected to its designated VCC pin. This voltage is essential for powering the IC on the evaluation module.

    2. Ground Connection: For optimal performance, the ground pin of the LM3248EVM needs to be connected to the circuit's common ground. This connection is key to minimizing operational noise and ensuring stability.

    3. Configuring Output Voltage: The output voltage of the IC on the LM3248EVM can be set through external resistors connected to specific pins. These resistors enable fine-tuning of the voltage output according to the desired evaluation parameters.

    4. Load Attachment: The output from the LM3248EVM is then directed towards the load, which can vary depending on the nature of the evaluation tests being conducted.

    5. Control and Feedback Arrangements: The module features control and feedback pins, which are integral for adjusting and monitoring the output voltage in real-time. These pins are typically linked to a microcontroller or similar control system for precise evaluation purposes.

    In the process of setting up the LM3248EVM in a test circuit, it is crucial to consider the purpose of each pin, extending beyond mere power supply connections to include control inputs and load management. Proper planning and integration of the LM3248EVM enable a comprehensive evaluation of the LM3248 series ICs, ensuring they are suitable for their intended power management applications.

    LM3248EVM FAQ

    1. How to order LM3248EVM on icwhale.com?

    Currently, icwhale.com only provide peer-to-peer order processing. While you submit the RFQ, our professional agent will contact you with the competitive prices in the global market, and our agent will prompt you to finish the order if you accept our offers.

    2. How does icwhale.com guarantee that LM3248EVM is from the original manufacturer or authorized agents?

    We have a professional and experienced quality control team to strictly verify and test the LM3248EVM. All suppliers must pass our qualification reviews before they can publish their products including LM3248EVM on icwhale.com; we pay more attention to the channels and quality of LM3248EVM products than any other customer. We strictly implement supplier audits, so you can purchase with confidence.

    3. Are the LM3248EVM price and inventory displayed accurate?

    The price and inventory of LM3248EVM fluctuates frequently and cannot be updated in time, it will be updated periodically within 24 hours. And, our quotation usually expires after 5 days.

    4. What forms of payment are accepted?

    Wire Transfer, PayPal, Alipay, Wechat, Credit Card, Western Union, MoneyGram, and Escrow are all acceptable.

    Warm Tips: Some orders in certain payment forms may require handling fee.

    5. How is the shipping arranged?

    Customers can choose industry-leading freight companies, including DHL, UPS, FedEx, TNT, and Registered Mail. Shipping insurance is also available.

    Once your order has been processed for shipment, our salesperson will send you an email advising you of the shipping status and tracking number.

    Warm Tips: It may take up to 24 hours for the carriers to display tracking information. Usually, express delivery takes 3-5 days, and registered mail takes 25-60 days.

    6. What is the process for return or replacement of LM3248EVM?

    All goods will implement Pre-Shipment Inspection (PSI), selected at random from all batches of your order to do a systematic inspection before arranging the shipment. If there is something wrong with the LM3248EVM we delivered, we will accept the replacement or return of the LM3248EVM only when all of the below conditions are fulfilled:

    (1)Such as a deficiency in quantity, delivery of wrong items, and apparent external defects (breakage and rust, etc.), and we acknowledge such problems.

    (2)We are informed of the defect described above within 90 days after the delivery of LM3248EVM.

    (3)The PartNo is unused and only in the original unpacked packaging.

    Two processes to return the products:

    (1)Inform us within 90 days

    (2)Obtain Requesting Return Authorizations

    7.How to contact us to get technical supports, such as LM3248EVM pin diagram, LM3248EVM datasheet?

    If you need any after-sales service, please do not hesitate to contact us.

    Hot Products

    Home

    Home

    Products

    Products

    Phone

    Phone

    Contact Us

    Contact