LM317A-337N-EVM

lmages are for reference only See Product Specifications

FREE SAMPLE

Texas Instruments LM317A-337N-EVM

HIGH-RELIABILITY-COMPONENTS
Part No.:
LM317A-337N-EVM
Manufacturer:
Texas Instruments
Package:
Datasheet:
LM317A-337N-EVM.pdf
Description:
EVAL BOARD FOR LM317A LM337-N
In Stock:
3443
Quantity:
  Add To Cart
For more detailed including pricing and shipping
Quick response, quick quotation
Flash shipment, no worries after sales
Original channel, guarantee of the authentic products

Please send RFQ , we will respond immediately.

Part Number
Quantity
Email / phone number*
Contact Name / Company Name
Comments
  • Purchase and inquiryPurchase and inquiry

    LM317A-337N-EVM this integrated circuit is available in factory sealed anti static packs. at icwhale.com. Please read product page below detail information. including LM317A-337N-EVM price, data-sheet, in-stock availability, technical difficulties. Also. Quickly Enter the access of compare listing to find out replaceable electronic parts. If you want to retrieve comprehensive data for LM317A-337N-EVM to optimize the supply chain (including cross references, life-cycle, parametric, counterfeit risk, obsolescence managements forecasts), please contact to our Tech-supports team.

    Purchase in icwhale.com

    There is no doubt that you may place an order without registering to icwhale.com.

    We strongly suggest you sign in our shop before purchasing as you can track your order real-time tracking.

    Means of Payment in icwhale.com

    For your convenience, we support multiple payment methods in USD, including PayPal, Credit Card, wire transfer. and Alipay.

    RFQ (Request for Quotations) in icwhale.com

    It is recommended to acquire for quotations to get the latest prices and inventories about the parts.

    Our sales will reply to your request by email within 24 hours.

    Warm reminder

    1. You'll receive an order information email in your email inbox. (Please remember to check the spam folder if you didn't hear from us).

    2. Since inventories and prices may fluctuate to some extent, the sales manager is going to reconfirm the order and let you know if there are any updates.

    Shipping & Handling

    Shipping fee starts at $35, but some countries will exceed $35. For example (South Africa, Brazil, India, Pakistan, Israel, etc.)

    The basic freight (for package ≤0.5kg or corresponding volume) depends on the time zone and countries.

    Shipping Method

    Currently, our products are shipped through DHL, FedEx, SF, UPS and China Post.

    Order Tracking for International Orders

    Once your order has been shipped, the tracking number will be sent to the email address registered to your account. This information can also be viewed when logged into your account in the "my account" page.

    LM317A-337N-EVM informationLM317A-337N-EVM information

    Views:

    LM317A-337N-EVM Typical application Circuitry

    LM317A-337N-EVM

    The LM317A-337N-EVM belongs to the series of evaluation modules designed for testing and experimenting with linear voltage regulators, specifically the LM317A and the LM337N. The positive voltage regulator LM317A can provide more than 1.5 A throughout an output voltage range of 1.25 V to 37 V. The negative counterpart, LM337N, can provide the same current levels across a voltage range of -1.25 V to -37 V.

    1. Input Voltage (LM317A, Positive Regulator): Connect a positive voltage supply within the regulator's specified range to the input pin. At the very least, the dropout voltage must separate the input from the intended output voltage.

    2. Output Voltage (LM317A, Positive Regulator): The adjustable output voltage is accessed from this pin. By connecting a resistor network between this pin, the adjustment pin, and ground, you can set the output voltage to your desired level.

    3. Adjustment (LM317A, Positive Regulator): This pin modifies the voltage output. The connection of a resistor network between the output pin and ground allows you to set the output voltage.

    4. Input Voltage (LM337N, Negative Regulator): Connect a negative voltage supply within the regulator's specified range to the input pin. Similar to the positive regulator, ensure the input is lower than the desired output voltage by at least the dropout voltage.

    5. Output Voltage (LM337N, Negative Regulator): Obtain the adjustable negative output voltage from this pin. The output voltage is set via a resistor network connected to the adjustment pin.

    6. Adjustment (LM337N, Negative Regulator): This pin is used to adjust the output voltage. Setting the output voltage involves a resistor network similar to that used with the positive regulator.

    7. Key Features of the LM317A-337N-EVM:

    - Adjustable Output Voltage: Both the LM317A and LM337N on the EVM provide an adjustable output voltage, allowing for a wide range of applications.

    - Dual Polarity Regulation: The EVM includes both a positive and negative voltage regulator, making it versatile for circuit prototyping that requires both supply types.

    - High Current Capability: Each regulator on the EVM can supply more than 1.5 A of current, accommodating a substantial power requirement.

    - Evaluation Module: The LM317A-337N-EVM is designed for easy setup and evaluation of the voltage regulators, featuring convenient test points and jumper settings.

    8. Circuit Design Considerations for the LM317A-337N-EVM: When utilizing the LM317A-337N-EVM in a circuit, it is essential to consult the datasheet for detailed specifications on power supply voltages, output current limits, and the resistor network required to set the output voltages. Ensure the input voltage always exceeds the desired output by at least the dropout voltage. Proper heat sinking may also be necessary to manage the thermal load, especially when drawing significant current.

    In summary, the LM317A-337N-EVM offers a practical platform for the testing and application of the LM317A and LM337N voltage regulators, providing adjustable, dual polarity voltage regulation with substantial current capabilities. Its design facilitates a wide variety of power configurations, making it a valuable tool for developing and prototyping electronic circuits.

    LM317A-337N-EVM FAQ

    1. How to order LM317A-337N-EVM on icwhale.com?

    Currently, icwhale.com only provide peer-to-peer order processing. While you submit the RFQ, our professional agent will contact you with the competitive prices in the global market, and our agent will prompt you to finish the order if you accept our offers.

    2. How does icwhale.com guarantee that LM317A-337N-EVM is from the original manufacturer or authorized agents?

    We have a professional and experienced quality control team to strictly verify and test the LM317A-337N-EVM. All suppliers must pass our qualification reviews before they can publish their products including LM317A-337N-EVM on icwhale.com; we pay more attention to the channels and quality of LM317A-337N-EVM products than any other customer. We strictly implement supplier audits, so you can purchase with confidence.

    3. Are the LM317A-337N-EVM price and inventory displayed accurate?

    The price and inventory of LM317A-337N-EVM fluctuates frequently and cannot be updated in time, it will be updated periodically within 24 hours. And, our quotation usually expires after 5 days.

    4. What forms of payment are accepted?

    Wire Transfer, PayPal, Alipay, Wechat, Credit Card, Western Union, MoneyGram, and Escrow are all acceptable.

    Warm Tips: Some orders in certain payment forms may require handling fee.

    5. How is the shipping arranged?

    Customers can choose industry-leading freight companies, including DHL, UPS, FedEx, TNT, and Registered Mail. Shipping insurance is also available.

    Once your order has been processed for shipment, our salesperson will send you an email advising you of the shipping status and tracking number.

    Warm Tips: It may take up to 24 hours for the carriers to display tracking information. Usually, express delivery takes 3-5 days, and registered mail takes 25-60 days.

    6. What is the process for return or replacement of LM317A-337N-EVM?

    All goods will implement Pre-Shipment Inspection (PSI), selected at random from all batches of your order to do a systematic inspection before arranging the shipment. If there is something wrong with the LM317A-337N-EVM we delivered, we will accept the replacement or return of the LM317A-337N-EVM only when all of the below conditions are fulfilled:

    (1)Such as a deficiency in quantity, delivery of wrong items, and apparent external defects (breakage and rust, etc.), and we acknowledge such problems.

    (2)We are informed of the defect described above within 90 days after the delivery of LM317A-337N-EVM.

    (3)The PartNo is unused and only in the original unpacked packaging.

    Two processes to return the products:

    (1)Inform us within 90 days

    (2)Obtain Requesting Return Authorizations

    7.How to contact us to get technical supports, such as LM317A-337N-EVM pin diagram, LM317A-337N-EVM datasheet?

    If you need any after-sales service, please do not hesitate to contact us.

    Hot Products

    Home

    Home

    Products

    Products

    Phone

    Phone

    Contact Us

    Contact